PMFBY Extension and FIAT Fund 2025: Crop Insurance, YES-TECH and WINDS

Home PMFBY Extension and FIAT Fund 2025: Crop Insurance, YES-TECH and WINDS
00 Comment 5 days ago

TARGET FOR IQ · CURRENT AFFAIRS

PMFBY Extension and FIAT Fund 2025: Crop Insurance, YES-TECH and WINDS

Current affairs reading · 3 min read · English

1 January 2025 · Agriculture & Rural Development

On this page

What is the update?

On 1 January 2025, the Cabinet approved continuation of PMFBY and RWBCIS through 2025–26 and a technology fund for crop-insurance administration. The decision combined insurance support with better yield and weather information.

Funding and the period covered

The approved overall outlay was ₹69,515.71 crore for 2021–22 to 2025–26. This is a multi-year figure, not an amount allocated solely for calendar year 2025. The two schemes covered by the decision were Pradhan Mantri Fasal Bima Yojana and the Restructured Weather Based Crop Insurance Scheme.

A separate Fund for Innovation and Technology, or FIAT, was approved with a corpus of ₹824.77 crore. It was intended to support technology initiatives and research that could improve transparency in estimating losses, calculating claims and settling them.

YES-TECH: estimating crop yields

YES-TECH stands for Yield Estimation System using Technology. It brings remote-sensing information into crop-yield estimation and assigns at least 30% weight to technology-based estimates. The practical purpose is to reduce dependence on a single method of measurement and improve the evidence used in claim calculations.

The announcement listed Andhra Pradesh, Assam, Haryana, Uttar Pradesh, Madhya Pradesh, Maharashtra, Odisha, Tamil Nadu and Karnataka as implementing states. Madhya Pradesh was identified as using fully technology-based yield estimation. It also recorded use of YES-TECH for 2023–24 claim calculations and settlement. These are dated implementation statements, not a claim that the same arrangements already applied in every state.

WINDS: building local weather information

WINDS expands to Weather Information and Network Data Systems. Its design envisaged automatic weather stations at block level and automatic rain gauges at panchayat level. The intended fivefold increase in network density was a target for more localised weather observations, not evidence that the entire expansion had already been completed.

The reported implementation pipeline covered Kerala, Uttar Pradesh, Himachal Pradesh, Puducherry, Assam, Odisha, Karnataka, Uttarakhand and Rajasthan. Government payments under the described model were for renting the data. Because preparatory work delayed the original start, 2024–25 replaced 2023–24 as the first implementation year, preserving the benefit of the higher 90:10 central-state funding arrangement.

North-East provisions and exam relevance

The decision highlighted priority coverage in the North-Eastern states, where the Centre bears 90% of the premium subsidy. Since participation is voluntary and gross cropped area is comparatively low, flexibility was allowed to reallocate funds to other development requirements rather than surrender unused amounts.

For a mains answer, separate the three problems addressed: farmers’ exposure to crop losses, measurement of yields, and availability of reliable local weather data. Insurance funding addresses financial protection; YES-TECH and WINDS address the quality of information on which administration depends.

Exam revision

  • Continuation approved through financial year 2025–26.
  • ₹69,515.71 crore relates to 2021–22 through 2025–26.
  • FIAT corpus: ₹824.77 crore.
  • YES-TECH concerns yield estimation; WINDS concerns weather-data infrastructure.

Quick questions

Was ₹69,515.71 crore a one-year allocation?

No. The announced overall outlay covered five financial years, from 2021–22 through 2025–26.

Were the technology targets already achieved nationwide?

The decision described a combination of implementation, expansion plans and targets. It did not establish universal completion.

Official reference: Cabinet — dated announcement.

Related Post

00 Comment 3 days ago

UP PCS-J 2026 GS Syllabus — 9 Minor Acts for Prelims and Mains

UP PCS-J 2026 GS Syllabus — 9 Minor Acts for Prelims and MainsUPPSC के विज्ञापन A-6/E-1/2026 के अनुसार, UP PCS-J के General Knowledge syllabus में नीचे दिए नौ अधिनियम पढ़ने हैं। Prelims...

00 Comment 3 days ago

Rajasthan APO 2026 Official Syllabus and Exam Pattern — Prelims and Mains

Rajasthan APO 2026 Official Syllabus and Exam Pattern — Prelims and Mainsराजस्थान लोक सेवा आयोग ने विज्ञापन 03/EXAM/APO/EP-I/2026-27, दिनांक 27 मई 2026 के तहत सहायक अभियोजन अधिकारी के 371 पद विज्ञापित किए।...

00 Comment 3 days ago

UP APO Mains 2025 Official Question Papers – Download All Six PDFs

UP APO Mains 2025 Official Question Papers – Download All Six PDFsUPPSC के विज्ञापन A-8/E-1/2025 के UP APO Mains प्रश्नपत्र यहाँ पेपर कोड के अनुसार डाउनलोड करें। आयोग ने इन्हें 10 सितंबर...

00 Comment 3 days ago

Bihar APO 2026 Official Syllabus — Prelims, Mains Papers and Other Laws

Bihar APO 2026 Official Syllabus — Prelims, Mains Papers and Other LawsBihar Public Service Commission के विज्ञापन 13/2026 की चयन प्रक्रिया में Prelims, Mains और Interview हैं। नीचे के विषय और अंक...

00 Comment 3 days ago

UP PCS-J Mains Answer Writing — Evaluated GS Sample and Marking Breakdown

UP PCS-J Mains Answer Writing — Evaluated GS Sample and Marking Breakdownयह Target for IQ का मौलिक अभ्यास है। नीचे दिए अंक हमारे उदाहरण की rubric पर आधारित हैं।अभ्यास प्रश्न · 10...