TARGET FOR IQ · CURRENT AFFAIRS
Rural 4G Saturation Project: Coverage Progress and Remaining Gaps
Current affairs reading · 3 min read · English
On this page
What is the update?
The Department of Telecommunications reported that villages without 4G connectivity fell from 45,180 in 2022 to 11,372 in 2026. The reduction was nearly 75%, supported by the public 4G Saturation Project and private network expansion.
The main figures
| Measure | Reported position |
|---|---|
| Villages originally targeted by the saturation project | 24,680 previously unconnected villages |
| BSNL sites commissioned under the rollout | 18,291 |
| Additional sites sanctioned for the next phase | 26,000 |
| Villages still without 4G in the national comparison | 11,372 |
Villages and network sites are different units. A site is infrastructure; a village is a settlement counted for coverage. Their numbers should not be treated as interchangeable, and sanctioning a site is different from commissioning it.
Coverage and use are separate questions
The ministry reported substantial data use on the commissioned BSNL sites during October. The account cited a maximum of 1,021,048 active users in a day and approximately 18.66 million GB of monthly data traffic. These refer to different time bases: a peak daily user measure and a monthly traffic volume.
Coverage indicates that a service has reached an area. Usage shows that people are drawing on that service. Quality, affordability, device access and digital skills can still affect the benefit residents receive after a site becomes operational.
Why the remaining areas are difficult
The update identified difficult terrain, dispersed settlements, remote tribal habitations and high infrastructure costs. A remote site may serve relatively few people, yet provide an important connection to public services. This creates a policy challenge that cannot be understood only through traffic volumes.
The stated next steps included additional sites, infrastructure sharing and closer coordination with service providers. Sharing can make better use of available infrastructure, while targeted deployment can address places where ordinary expansion has left gaps.
Exam perspective
The digital divide concerns both access and the practical ability to use connectivity. Rural mobile networks can support education, healthcare, financial services and access to government systems. Those benefits depend on functioning services beyond the network itself.
Use the 2022–2026 village comparison as a reported coverage trend. Do not describe the project as having connected every village: the same update identifies a remaining gap and a further phase of work. The coverage comparison also includes the contribution of private operators, not BSNL alone.
Exam revision
- Villages without 4G: 45,180 in 2022; 11,372 in 2026.
- BSNL commissioned sites cited: 18,291.
- Sanction, commissioning, coverage and usage are different measures.
Quick questions
Does sanctioning 26,000 sites mean they were all operational on 11 November?
No. The figure refers to approval for the next expansion phase.
Official references: Ministry of Communications — 2026-11-11.